Chicago Freight Restack LEANING IN, SQUARE OUT 708-252-9373

Home / Shifted Loads

Load moved in transit

Shifted Load Restacks in Chicago, Rebuilt Pallet by Pallet

When a stack slides into the side wall or folds over at the tail, the freight needs a crew and a dock door. Ours are in Bedford Park and open around the clock.

Signs Your Load Has Shifted

  • Pallets leaning against the trailer wall
  • Cases spilled onto the floor
  • Stretch film torn or hanging loose
  • Top layers crushed or caved in
  • A load bar out of place

Our Shifted Freight Restack Process

We clear the spilled cases, unload the leaning pallets one at a time and rebuild each layer with the heavy cases low and the corners lined up. Fresh film goes on before the pallet goes back in.

Securing the Trailer Again

Gaps get closed, load bars or straps get placed, and the rear pallets are checked so nothing can walk toward the doors on the next leg.

Damaged Product Set Aside

Crushed or leaking cases are kept separate and counted, so you have a clear picture for the receiver and any claim.

Stack of boxes leaning hard to one side inside a trailer
Leaning at the wall
Boxes restacked straight on pallets inside a trailer
Rebuilt straight

Load leaning right now

Hear the load move on the road?

Ring the restack line, then point the truck at Bedford Park.

Call 708-252-9373