Home / Shifted Loads
Load moved in transit
Shifted Load Restacks in Chicago, Rebuilt Pallet by Pallet
When a stack slides into the side wall or folds over at the tail, the freight needs a crew and a dock door. Ours are in Bedford Park and open around the clock.
Signs Your Load Has Shifted
- Pallets leaning against the trailer wall
- Cases spilled onto the floor
- Stretch film torn or hanging loose
- Top layers crushed or caved in
- A load bar out of place
Our Shifted Freight Restack Process
We clear the spilled cases, unload the leaning pallets one at a time and rebuild each layer with the heavy cases low and the corners lined up. Fresh film goes on before the pallet goes back in.
Securing the Trailer Again
Gaps get closed, load bars or straps get placed, and the rear pallets are checked so nothing can walk toward the doors on the next leg.
Damaged Product Set Aside
Crushed or leaking cases are kept separate and counted, so you have a clear picture for the receiver and any claim.


More freight restack help
Load leaning right now
Hear the load move on the road?
Ring the restack line, then point the truck at Bedford Park.